Independent review of cost, schedule, and constructability for owners and developers. We find the exposure while the decisions are still cheap to change, not after the price is signed.

A GMP feels like certainty. But the number is only as good as the design, schedule and scope behind it, and most of the exposure is baked in before anyone breaks ground.
A GMP built on an incomplete design carries assumptions, allowances and gaps you never see, until they arrive as change orders.
Programs are sold, not stress-tested. Procurement lead times, sequencing and float rarely survive contact with the real job.
Gaps between packages and interfaces are invisible on paper and expensive on site. Nobody owns them until someone has to pay for them.
Every review we run answers the same three questions in order: what's the risk, how do we take it apart, and what does that win you.
See what we reviewThe cost plan, the program and the design were each built by someone with a stake in the outcome. The gaps between them, the real risk, are exactly what nobody is paid to surface.
We reconcile the price against the design and the schedule, stress-test contingency and sequencing, and pull apart the interfaces where scope hides. BIM, 4D and 5D are our tools, the finding is the deliverable.
A clear, written view of where the money and time actually sit at risk, and what to fix while it still costs a comment. You walk into the GMP knowing what you're signing.
Four independent reviews, run before the GMP, while there is still time to change the outcome.
No long onboarding, no production line. A tight, senior-led engagement scoped to the decision in front of you.
A short call to understand where the project stands and what's about to be signed. We tell you which review fits and whether it's worth doing now.
We reconcile cost, schedule and design ourselves, senior-led, using BIM/4D/5D as tools. You get one point of contact, not a handoff.
A written view of the real exposure with a clear recommendation, and a working session to walk you through what to fix before the GMP.
A review pays for itself the first time it turns a change order back into a comment.
Walk into the price knowing what's real, what's an allowance, and where the number is exposed, to your board, your lender and yourself.
The gaps, clashes and thin allowances that become variations on site get caught while they still cost a redraw, not a claim.
A program that's been stress-tested against procurement and sequencing, so the completion date you promise is one you can keep.
An independent, written basis for the calls you make now, the record that protects you if the project is ever questioned later.
Someone in the room whose only job is to protect your interest, no design to defend, no delivery to protect, no software to sell.
Change made in the pre-GMP window costs a fraction of the same change on site. We put you there, on purpose.
An independent practice, not a production house. You work directly with the person doing the analysis.
Reltic VDC holds no position in delivery. No software to sell, no design to defend, no construction to protect. The only question on the table is whether your project decisions hold up.
The work happens before the price and the schedule lock, while there is still leverage to change the outcome. This is the window where a problem costs a comment, not a change order.
You work with our senior team on the analysis. No account manager, no junior handoff, no offshore production. Senior reviewers stay accountable from the first read to the final recommendation.
We use BIM, 4D, and 5D as analysis tools. The model informs the decision. The model is never the deliverable. What you receive is findings and a clear recommendation.
If the exposure lands on your balance sheet, you should have an independent read before it's locked in.
You're the one signing the GMP and living with the result. We give you an independent read before you commit.
Your capital is riding on numbers someone else built. We give you an independent basis to trust, or challenge, them.
You'll manage this build for years. We hand you a clear map of where the risk sits before it becomes your day-to-day.
"A change made before the GMP costs a comment. The same change after it costs a claim. We spend our whole engagement in the window where the price is still yours to move."
Tell us where the project stands. We'll tell you what a review would look at and whether it's worth doing now.
We schedule a short call at your convenience.
We scope the right review and confirm timing.
You get findings and a clear recommendation.