Category: Scenarios

Allowances get carried into the price without a verified basis. We test what is real before the number becomes a commitment.
The GMP is priced against a design that is not yet complete. We expose the gap before it turns into a change order.
A buffer set without testing where this project type actually fails. We stress it against real exposure before you sign.
A clean-looking schedule that quietly ignores procurement reality. We test whether it survives the field, not just the page.
Buyout timing that breaks the install sequence. We align procurement with the schedule before lead times break the date.
Site access and sequencing conflicts found too late. We map the chokepoints early, while the sequence can still be changed.
Responsibility that falls between trades, unpriced and unowned. We find the gaps before they surface as a field change order.
Interface conflicts that are cheap on screen and expensive in the field. We resolve them before the packages are awarded.
Key details that look fine in design but do not survive construction. We flag them while they are still cheap to fix.
Takeoffs built on incomplete design information. We verify quantities on the high-risk packages before they drive the price.